Golden Ears Bridge

Vancouver, BC
  • On site from May 2006 to April 2007
  • General Contractor: Bilfinger Berger
  • Retained from the onset to address challenges initially presented by the test piles required for this megaproject
  • High profile environmentally sensitive site
  • No site downtime after system installation
  • This was a complex treatment system with removal of toxic vinyl chloride. We used our patented technology to remove toxic organics while managing the DO (dissolved oxygen) for aquatics.
  • Ideal DO range is 7 to 12 mg/L
  • Bioreactor is liquid incineration technology with an automatic feedback system to control the DO of the water

Interested in a project?